
CLIENT(S):
Matexi, ING Real Estate, Development NV
Masterplan
Matexi
Architecture:
Atelier d’Architecture Alta
LOCATION:
rue Père de Deken, 1040 Etterbeek
TIMING:
2009 start development
2010 expected completion date
Merode station is close by. Transparent and light, the facade of the building is constructed using contemporary terracotta elements on an aluminium structure. A water feature and harmonious plantings guide the visitor to the main entrance. Fusio strives for efficiency and flexibility from a user perspective without losing sight of the ecological aspects.