Etterbeek Fusio

    Summary

    CLIENT(S): Matexi, ING Real Estate, Development NV
    Masterplan Matexi
    Architecture: Atelier d’Architecture Alta

    LOCATION: rue Père de Deken, 1040 Etterbeek

    TIMING:
    2009 start development
    2010 expected completion date

    ETTERBEEK FUSIO

    Merode station is close by. Transparent and light, the facade of the building is constructed using contemporary terracotta elements on an aluminium structure. A water feature and harmonious plantings guide the visitor to the main entrance. Fusio strives for efficiency and flexibility from a user perspective without losing sight of the ecological aspects.